Back to all station trips
2 & Line 3Daegu · Cheongna Hill

Cheongna Hill Station

Cheongna Hill: red brick, independence history and modern Daegu

Start at Cheongna Hill Station Exit 9 and connect Cheongna Hill, March First Movement Road, Gyesan Cathedral and historic homes. Allow 2–3 hours, but use this question to edit the day: “Keep missionary medicine, religion and independence history as connected but different stories.” Recheck official opening, reservation and safety notices on the day; When interiors are closed, read the outdoor signs and continue downhill on the public route.

Cheongna Hill Station entrance
A route that starts at the stationCheongna Hill Station · Daegu

TAKE IT WITH YOU

Turn this guide into a route you can use

Open the stops in Google Maps and keep the Korean place names ready for signs, ticket desks, and local searches.

Information checked 2026.09.08
Recheck changing details on the day2 official sources linkedView official sources
Start
Cheongna Hill Station Exit 9
Time needed
2–3 hours
Allow
2–3 hours

STATION CHECK

Recheck the exit, lift, luggage and last train

Daegu public transport information

Suggested exit & walk

Cheongna Hill Station Exit 9About 6 min to Cheongna HillThe suggested exit may not be the lift exit. With luggage or mobility needs, prioritise the accessible route.

Lift & step-free route

Daegu public transport informationCheck the origin, interchange and destination separately. Maintenance can change the route, so ask station staff for day-of help.Use the Cyber Station for internal facilities, accessibility, exits and direction-specific train times.

Luggage storage

Check station facilitiesLocker availability, size and operating status can change. Check the official station facility listing before travelling with bags.

First & last train

Daegu public transport informationTimes vary by line, direction, weekday, weekend and holiday. For a late trip, verify the last possible interchange too.
Fit the route to your time
Last check before you go
The day before

Check closures, bookings, events, access controls and weather.

Before setting out

Recheck last trains, transfers, works and lift availability.

Open the full route in Google Maps. Recheck last trains, works and facility outages with the city operator on the day.

REALISTIC ROUTE

Walk it in this order

  1. 1

    Cheongna Hill Station Exit 9

    Confirm exit, official status, weather and the route home.

    00:00
  2. 2

    Cheongna Hill

    The hill’s houses show routes of medicine and education as well as architecture. Reassess energy before continuing.

    01:10
  3. 3

    March First Movement Road

    The March First stairs connect past movement with present commemoration. Reassess energy before continuing.

    02:20
  4. 4

    Gyesan Cathedral and historic homes

    Gyesan Cathedral remains a place of worship; services take priority. Reassess energy before continuing.

    03:30
  5. 5

    Cheongna Hill Station

    Return by the safest practical station or stop.

    Finish

TRAVELER COMMUNITY

Help keep this station useful for the next traveler

What you noticed at Cheongna Hill Station—the exit you used, actual timing, crowds, accessibility, or a temporary change—can help the next visitor make a safer decision.

Guides, community posts, and saved trips are available without sign-in.

Posting and replies will be available after Google sign-in is connected.